We are managing a 5-star hotel construction in Middle East (Bahrain), based on lump-sum contract of ~110 Million USD.
1- What may be the percentage of the claims (statistically) from the contractor side, by the end of the construction?
2- What may be the number of workers death (statistically) for this 34 storey, 55,000 sqm construction, planned to be finished in 30 months?


LinkBack URL
About LinkBacks
Reply With Quote